Mailbox:info@chinaleadtop.com service@ltpmchina.com Business Phone : 86-0577-65158955
LABEL SHRINKING MACHINE
LABEL SHRINKING MACHINE
FOREWORD
Our company is a large scale company that specialized in development and manufacture of many models of thermal shrink packaging machines, and equipped with advanced production machinery. We have large scope of products models: micro- and extra-large machine, manual model and automatic model, simple model and high-exactitude model, which can meet many different requirements. Our shrink packaging machine has advantage of high heating efficiency, accurate temperature control and stable performances, which helps us win big market share in China, even overseas.
SPECIFICATION
Model |
BSS-1538 |
Power |
7 KW |
Max. packing size (mm) |
Φ105*350H Adjustable |
Size of shrink tunnel (mm) |
1000*150*150 |
Conveyor motor |
AC90W/220V |
Conveyor speed |
0-10m/min |
Loading weight |
15kg |
Conveyor |
812 S/S plate |
Weight |
90 kg |
Dimension (mm) |
1500*350*1500 |
Packed size (mm) |
1610*1030*490 |
STRUCTURE DIAGRAM
CONTROL PANEL
1. Power: control the power of machine
2. Fan: control the motor of fan
3. Conveyor: control the motor of conveyor
4. Heating: control the heating pipes
5. Temp. meter: adjust temp. of shrink tunnel
6. Speed Adjuster: adjust speed of conveyor
7. Upper Heating: adjust heating of upper heating pipes
8. Down Heating: adjust heating of down heating pipes
REFERENCE OF SHRINK TEMP. AND TIME
Shrinking membranes |
THINKNESS (MM) |
SHRINKING TIME (S) |
TEMPERATURE (℃) |
PVC |
0.02-0.06 |
5-10 |
110-130 |
PP |
0.02-0.04 |
6-12 |
130-170 |
PE |
0.06-0.20 |
10-60 |
150-180 |
CAUTION
1.Rated power of this machine is very big; so make sure that input power of electricity is bigger than rated power of machine, otherwise machine is unable to work properly. Additionally, power source must be the same as noted on the tag, otherwise circuitry or electric components will be burned.
2.The electricity wires must be connected properly; otherwise it makes damage to machine and operator. When the power is 3 phases (4 wires) as noted on the tag, it must input the null wire, or the machine can’t work normally and easy to burn the electronics.
3.The machine must do the earth connection. It is easy to get electric shock for operator without earth connection.
4.Do not set temp. above 200℃, or damage heating pipes or shorten its life.
5.The machine should be placed level; otherwise it will reduce the life of heating pipe.
6.During working, carbon brush in motor wears off. It is only for BSS-1538D. So check carbon brush in every half year. Replace it carbon brush when it wears out. If not, motor will damage. Clean powder of carbon brush in motor while replacing.
7.Every three months, check the wire and heating pipe in the tunnel because it is get aging and burned by heat from shrink tunnel; replace it if it is necessary.
8.Do not touch conveyor or stretch hands into shrink tunnel to keep from burning, while the machine is working.
9.In order to prolong the life of heating pipes, do the right operation according to following step:
a)While start machine, put on the heating device and hot fan together at the same time.
b)While stop machine, put off the heating device first and let fan run for a while to cool down.
10.Check the carbon brush of fan motor when the speed of motor is getting slower; carbon brush wears off gradually during usage, so check up the carbon brush often, which is found under a small cap; Replace it if cabon brush uses up, and clean up brush powder inside of motor.
commonMALFUNCTION
Case |
Cause |
Method |
|||||||||||||||||||||||||||||||||||||||||||||||||
No heat in the tunnel |
No power |
Put on the power |
|||||||||||||||||||||||||||||||||||||||||||||||||
Heating switch broken |
Replace |
||||||||||||||||||||||||||||||||||||||||||||||||||
Heating pipe or circuitry broken |
Replace or repair |
||||||||||||||||||||||||||||||||||||||||||||||||||
AC contactor, Solid-booster or temp. meter broken |
FOREWORD
Our company is a large scale company that specialized in development and manufacture of many models of thermal shrink packaging machines, and equipped with advanced production machinery. We have large scope of products models: micro- and extra-large machine, manual model and automatic model, simple model and high-exactitude model, which can meet many different requirements. Our shrink packaging machine has advantage of high heating efficiency, accurate temperature control and stable performances, which helps us win big market share in China, even overseas.
SPECIFICATION
Model
BSS-1538
Power
7 KW
Max. packing size (mm)
Φ105*350H
Adjustable
Size of shrink
tunnel (mm)
1000*150*150
Conveyor motor
AC90W/220V
Conveyor speed
0-10m/min
Loading weight
15kg
Conveyor
812 S/S plate
Weight
90 kg
Dimension (mm)
1500*350*1500
Packed size (mm)
1610*1030*490
STRUCTURE DIAGRAM
CONTROL PANEL
1. Power: control the power of machine
2. Fan: control the motor of fan
3. Conveyor: control the motor of conveyor
4. Heating: control the heating pipes
5. Temp. meter: adjust temp. of shrink tunnel
6. Speed Adjuster: adjust speed of conveyor
7. Upper Heating: adjust heating of upper heating pipes
8. Down Heating: adjust heating of down heating pipes
REFERENCE OF SHRINK TEMP. AND TIME
Shrinking membranes
THINKNESS
(MM)
SHRINKING
TIME (S)
TEMPERATURE
(℃)
PVC
0.02-0.06
5-10
110-130
PP
0.02-0.04
6-12
130-170
PE
0.06-0.20
10-60
150-180
CAUTION
1.Rated power of this machine is very big; so make sure that input power of electricity is bigger than rated power of machine, otherwise machine is unable to work properly. Additionally, power source must be the same as noted on the tag, otherwise circuitry or electric components will be burned.
2.The electricity wires must be connected properly; otherwise it makes damage to machine and operator. When the power is 3 phases (4 wires) as noted on the tag, it must input the null wire, or the machine can’t work normally and easy to burn the electronics.
3.The machine must do the earth connection. It is easy to get electric shock for operator without earth connection.
4.Do not set temp. above 200℃, or damage heating pipes or shorten its life.
5.The machine should be placed level; otherwise it will reduce the life of heating pipe.
6.During working, carbon brush in motor wears off. It is only for BSS-1538D. So check carbon brush in every half year. Replace it carbon brush when it wears out. If not, motor will damage. Clean powder of carbon brush in motor while replacing.
7.Every three months, check the wire and heating pipe in the tunnel because it is get aging and burned by heat from shrink tunnel; replace it if it is necessary.
8.Do not touch conveyor or stretch hands into shrink tunnel to keep from burning, while the machine is working.
9.In order to prolong the life of heating pipes, do the right operation according to following step:
a)While start machine, put on the heating device and hot fan together at the same time.
b)While stop machine, put off the heating device first and let fan run for a while to cool down.
10.Check the carbon brush of fan motor when the speed of motor is getting slower; carbon brush wears off gradually during usage, so check up the carbon brush often, which is found under a small cap; Replace it if cabon brush uses up, and clean up brush powder inside of motor.
commonMALFUNCTION
Case
Cause
Method
No heat in the tunnel
No power
Put on the power
Heating switch broken
Replace
Heating pipe or circuitry broken
Replace or repair
AC contactor, Solid-booster or temp. meter broken
Add:LTPM CHINA 2nd Floor,Dongxin Road and 5th Development Road ,Caizhai Industrial Zone, Ruian City, Zhejing Province ,China Tel:86-0577-65158955 Fax: 86-0577-65158944 About Us Contact Us LeadTop Pharmaceutical Machinery Co., LTD 浙ICP备16043185号-1 LeadTop Pharmaceutical Machinery Co., LTD 浙ICP备20003428号-1 |